Level the Playing Field

Construction estimates assume you speak contractor. You don't—and that knowledge gap costs thousands in missed details, vague allowances, and questions you didn't know to ask.

Unclear Allowances

Vague allowances and poorly defined specifications can lead to massive cost overruns. We identify ambiguous line items so you can address them with your contractor before signing.

Scope Gaps

Understanding what's included and what's missing is critical to project success. We show you exactly where gaps exist so you know who's paying for what—before work begins.

Contractor Questions

Knowing what questions to ask is half the battle. We generate specific, actionable questions based on what's missing or unclear—so you can start your project on the right foot.

Your Concerns Addressed

Personalized analysis based on your input

Budget overruns

From Your Estimate

Excavation is listed as a lump sum without detail. Combined with the sloped lot you mentioned, this creates uncertainty around actual site preparation costs.

Analyzed in Phase B:

Excavation & Earthwork

No geotechnical report referenced

Hidden costs and change orders

From Your Estimate

Your estimate uses 'allowances' for flooring and fixtures without specifying what's included. These often lead to upgrade costs during construction when selections are made.

Analyzed in Phase F:

Interior Finishes

Flooring allowance lacks spec level details

Your questions answered the same way

Close the Knowledge Gap

Professional-grade analysis that closes the knowledge gap—so you can move forward with confidence, not confusion.

Estimate structure and quality assessment

Project context validation based on your specific project needs

Your questions and concerns answered

Overall confidence rating

Full financial summary

Prioritized contractor questions

25 Categories, Zero Guesswork

Every estimate is analyzed across 25 construction lifecycle categories—from permits and foundation to finishes and cleanup. For each category, you'll see exactly what's included, what's missing, and what needs clarification.

Plus, you get specific questions to ask your contractor—prioritized by importance so you know where to focus the conversation.

Phase E: Mechanical, Electrical, PlumbingConfidence – Medium

15. Electrical

Scope Check

Main electrical panel and breaker sizing specified
Rough-in for all outlets, switches, and fixtures
Permit and inspection fees not listed
EV charger rough-in—unclear if 240V circuit included

Contractor Questions

Does the panel upgrade include permit fees and final inspection?

Is a dedicated 240V circuit for EV charging included in this scope?

1 of 25 categories analyzed

From Estimate to Insight

Professional analysis delivered in 24 hours—no consultants, no additional quotes required.

1

Upload Your Estimate

Upload your estimate in PDF, Word, or Excel format—we'll handle the rest.

2

We Decode the Details

25 categories analyzed for gaps, unclear items, and budget confidence scoring.

3

Make Informed Decisions

Receive your complete analysis within 24 hours. Download the PDF or review online—then approach your contractor with confidence.

Start Decoding Your Estimate

Get professional-grade analysis in 24 hours—no consultant fees, no guesswork.

Drag & drop your estimate here or click to browse

Accepted formats: PDF, Excel, Word, or photos • Max 15MB • Secure upload

Analysis starts instantly
Free preview • $49.99 full report
100% private